Sunday, August 21, 2011

Struttin'

Worked on getting the Leg Struts installed yesterday. The problem was that the bottom piece of the struts were too long, and the builder who ran the piece had intended for them to extend into the ankles. I however,  followed LoLo080's method of cutting about an 1 & 1/4 inch off the end so they could be screwed in from under the Ankle Bracelet. I felt this was a better, more solid solution.



I enlisted my Dad and his plethora of power tools. I bought a metal cutting blade for his miter saw. It worked quite well and made a nice straight cut. Then we pulled his drill press out from the archives and used my drill and tap set for the first time. Neither of us had ever tapped something before, and it went fine except I think we didn't drill the first one deep enough. The second one we drilled out a smidgen more and it tapped much easier. Aside from sweating in the 100ยบ humidity it went off without a major hitch.

So now I can debut my completed Legs assemblies. Just need a little sanding and then they will be ready for some blue and white paint. Now back to working on the skins.


1 comment:

  1. Awesome! We have the same frame COM8B and thanks for the blog I will learn a lot from it.
    I am about 3 months behind you =)

    ReplyDelete